komora096
JF-Expert Member
- Sep 26, 2018
- 20,548
- 5,647
Kwhyo hicho kipande ni mradi mwngine tofautiushahidi huu hapa, una lingine la kusema?
Sent using Jamii Forums mobile app
Kwhyo hicho kipande ni mradi mwngine tofautiushahidi huu hapa, una lingine la kusema?
Hebu tuambie wangesemaje
Hapana fool!
Akirudi nitag plz....Hapana fool!
kule bandarini kuna upanuzi unaendelea berth 1-7..
Pia BRT inaendelea
Vyote vina muingiliano! Ukiangalia bridge over bridge na viaduct structures utaweza ona kuanzia Shaurimoyo kuna provision ya branch kuelekea kurasini!
Size yake
Nahisi waganda hawaja uonaUgandan delegation - Nairobi ICD
😁😁Akirudi nitag plz....
Hapana fool!
kule bandarini kuna upanuzi unaendelea berth 1-7..
Pia BRT inaendelea
Vyote vina muingiliano! Ukiangalia bridge over bridge na viaduct structures utaweza ona kuanzia Shaurimoyo kuna provision ya branch kuelekea kurasini!
Keep believing we will build SGR n leave it at the middle of nowhere like ur SGR terminating at Naivasha!
CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096 asvptx
Mombasa handles 30 million + tonnes annually. Dar ni mtoto kwa Mombasa apa AfricaHapana fool!
kule bandarini kuna upanuzi unaendelea berth 1-7..
Pia BRT inaendelea
Vyote vina muingiliano! Ukiangalia bridge over bridge na viaduct structures utaweza ona kuanzia Shaurimoyo kuna provision ya branch kuelekea kurasini!
Keep believing we will build SGR n leave it at the middle of nowhere like ur SGR terminating at Naivasha!
CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096 asvptx
Climate change itafanya bahari imeze Dar. Mlifanya ujinga sana kujenga Gdp yenu karibia nusu kando mwa bahari. Miaka 50 zijazo, Dar haitakuwepoFYI we are talking about a very short distance of appr. 5 km. It will not take more than 4 weeks man hours watakuwa wamemaliza kujenga.
For now they don't want to disturb the flow of freight trains out and into the port through NGR which is still the backbone of cargo transport for hinterland and the neighboring countries.
Once the Dar - Moro SGR, the marshaling yard and ICD at Kwala are ready. They will complete this 5 km SGR stretch from Shaurimoyo to the harbor. Thereafter, no freight NGR trains will be allowed to go to the port. Instead, freight NGR trains will offload and load their goods at Kwala ICD.
Only cargo SGR shunters will be plying between the port and Kwala ICD.
Sent using Jamii Forums mobile app
Climate change itafanya bahari imeze Dar. Mlifanya ujinga sana kujenga Gdp yenu karibia nusu kando mwa bahari. Miaka 50 zijazo, Dar haitakuwepo
Geza Ulole joto la jiwe
New york, Sanfransico, shanghai etc..Prettt good company to be withClimate change itafanya bahari imeze Dar. Mlifanya ujinga sana kujenga Gdp yenu karibia nusu kando mwa bahari. Miaka 50 zijazo, Dar haitakuwepo
Geza Ulole joto la jiwe
Boss, i would never want to be in that company.New york, Sanfransico, shanghai etc..Prettt good company to be with
haya nieleweshe ni vp SGR yenu yenye limit kwa wagon zenu zenye axle load 4 na kila moja ina uzito wa 25 tons zinaweza kubeba cargo zaidi ya SGR Tanzania yenye axle load 35 tons! Yet ur SGR ina speed limit at 80 km/h for cargo in comparison to 120 km/h for Tanzania's! Zaidi ya hapo SGR Tanzania ina provision ya kuunga treni za urefu wa 2 km ukiacha double stack! Endeleeni kudanganywa na Mchina!
CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096
Who told you tz train will have to wait, when we say it will pull up to 2km long it doesn't mean to wait until is 2km long.Sawa, tutakuelimisha.
Kenya SGR is designed for high frequency. Yaani train mingi fupi fupi 1km long running at the same time. This is achieved by having many crossing stations small distances apart, alot of locomotive engines and double stack to get short trains but carry many containers. For example at any point in time 12 trains or more will be heading to Nairobi from mombasa and 33 crossing stations mean trains wait a short time for the opposite train for go through a section. 25tons per axle means a carriage can carry 100tons, 2 40 ton containers stacked.Very few containers will pass 40tonnes weight which is the limit of trucks so its useless to make the rail be able to carry bigger weights unless its for carrying mining ore.
Tz you will fill a longer train but there will be few of them. Few crossing stations mean you can't put too many trains on the same track as they cant cross each other easy. The train will have to wait to get full but ile fupi ya Kenya is already on its way to Nairobi. So Tz train is faster but imepoteza wakati ikijazwa.
Mwishowe Kenya SGR itabeba more kwavile its optimized for high frequency trains.
KE SGR 22M tonnes per yearSawa, tutakuelimisha.
Kenya SGR is designed for high frequency. Yaani train mingi fupi fupi 1km long running at the same time. This is achieved by having many crossing stations small distances apart, alot of locomotive engines and double stack to get short trains but carry many containers. For example at any point in time 12 trains or more will be heading to Nairobi from mombasa and 33 crossing stations mean trains wait a short time for the opposite train for go through a section. 25tons per axle means a carriage can carry 100tons, 2 40 ton containers stacked.Very few containers will pass 40tonnes weight which is the limit of trucks so its useless to make the rail be able to carry bigger weights unless its for carrying mining ore.
Tz you will fill a longer train but there will be few of them. Few crossing stations mean you can't put too many trains on the same track as they cant cross each other easy. The train will have to wait to get full but ile fupi ya Kenya is already on its way to Nairobi. So Tz train is faster but imepoteza wakati ikijazwa.
Mwishowe Kenya SGR itabeba more kwavile its optimized for high frequency trains.
Climate change itafanya bahari imeze Dar. Mlifanya ujinga sana kujenga Gdp yenu karibia nusu kando mwa bahari. Miaka 50 zijazo, Dar haitakuwepo
Geza Ulole joto la jiwe
NIshawahi kukueleza ile scenario ya 4 one of your train kujazwa mizigo, treni zetu tatu zitakua zilijaa!haya nieleweshe ni vp SGR yenu yenye limit kwa wagon zenu zenye axle load 4 na kila moja ina uzito wa 25 tons zinaweza kubeba cargo zaidi ya SGR Tanzania yenye axle load 35 tons! Yet ur SGR ina speed limit at 80 km/h for cargo in comparison to 120 km/h for Tanzania's! Zaidi ya hapo SGR Tanzania ina provision ya kuunga treni za urefu wa 2 km ukiacha double stack! Endeleeni kudanganywa na Mchina!
CC: Zigi Rizla Kafrican Depay Teargass Tony254 pingli-nywee komora096
Inategemea by km unamaanisha nn kama track length (with side railway) is over 722 km but if just the distance btn the 2 places is 600 km!Dar to Makutupora ni km ngapi?